Tag Archives: Extreme Home Makeover Framing

Extreme Home Makeover Tucson – Framing

The Framing is Metal and on Schedule

Last night the concrete was poured and today the framing is going up. The framing for this project as you can see is metal. A lot of this was able to be pre assembled off site and as of late this evening the project was slightly ahead of schedule will a lot of work yet to be done. Continue reading

Posted in Extreme Makeover Tucson | Tagged | Leave a comment